celebrex lawyer

Four soil borings for the proposed Veterans Cemetery site have been completed. The borings show clay soils for 3-4.5 feet in each boring with medium to coarse sand underneath. The water level of the slough to the north corresponds with the water level of the boring. Pictured is Glenn Struckman from Scott Engineering boring the holes.

Comments are closed.